-1-
Submitted: Thursday 24-MAY-2018 09:46 AM
Company: Sletten Construction
Contact: Tracy Gilbert
Proposal #26 Sign Bridge Column Painting, says that the method of measurement and payment is under lump sum of Paint Structure. There is not a bid item for Paint Structure will there be an a amendment to add that bid item?
Answer
Submitted: Wednesday 30-MAY-2018 09:10 AM
The bid item is Miscellaneous Items – LS. There is a note under the Summary Frame for Paint Structure.
|
|
-2-
Submitted: Friday 01-JUN-2018 11:45 AM
Company: Nelcon, Inc.
Contact: Nelcon, Inc.
Would MDT consider a delayed NTP that would allow paving in 2019?
Answer
Submitted: Monday 04-MAY-2018 11:19 AM
MDT will not change the NTP to 2019.
|
|
-3-
Submitted: Monday 04-JUN-2018 11:34 AM
Company: Knife River
Contact: David Resch
In reference to SP-17, are there a limitation of times of operation for the seal and cover or are the times listed restricted to only the milling and paving operations?
Answer
Submitted: Tuesday 05-JUN-2018 10:28 AM
The time restrictions listed in Special Provision 17 - Traffic Control and Sequence of Operations pertain only to milling and paving operations.
|
|
-4-
Submitted: Friday 08-JUN-2018 02:54 PM
Company: Quality Landscape Seeding, Inc.
Contact: Estimating
In reference to bid item 610-100-557 (Revegetation), is fertilizer required? If so, at what rate and specification shall be used?
Answer
Submitted: Tuesday 12-JUN-2018 09:45 AM
Fertilizer is not required for the Revegetation item.
|
|
-5-
Submitted: Monday 11-JUN-2018 03:20 PM
Company: Sletten Construction Company
Contact: Tracy Gilbert
Pay quantity calls for 67.8 LF and at bridge 06949 bent 3, this location is only 34 lf +/-
There are 2 joints, I only see just the one location per the plans.
Answer
Submitted: Tuesday 12-JUN-2018 07:57 AM
This structure was widened in the early 90’s. As-built drawing number 6768 shows the original construction with a roadway width of 28 feet. As-built drawing number 15048 shows the widened structure which is 59’-4” from face of barrier to face of barrier. In addition there is a 5-foot wide sidewalk.
|