Contract Information
| Project Name | 5 MI NORTH OF ROSCOE-NORTH |
| Advertise Date | 06/14/2018 04:00 PM |
| Close Date | 07/09/2018 10:00 AM |
| Let Date | 07/12/2018 09:00 AM |
Notifications
No notifications found for this contract
Addendums
No addendums found for this contract
Clarifications
-1-
Submitted: Tuesday 10-JUL-2018 02:39 PM
Place classes Deck and Overlay-SF concrete with a temperature between 50 and 80 °F (10 and 26 °C). Place all other classes of concrete with a temperature between 50 and 85 °F (10 and 29 °C).
|
Questions
|
-1-
Submitted: Tuesday 19-JUN-2018 03:18 PM
Company: True North Steel
Contact: Rick Jones
Bid item 603 010 092 is calling for 3x1 corrugation. Is 5x1 acceptable?
Answer
Submitted: Wednesday 20-JUN-2018 04:03 PM
5" x 1" corrugations will be allowed for this item.
|
|
-2-
Submitted: Tuesday 19-JUN-2018 03:54 PM
Company: Sletten Construction
Contact: Tracy GilbertSubmitted: Tuesday 19-JUN-2018 03:54 PM
Company: Sletten Construction
Contact: Tracy Gilbert
Can you please add the as-built? Thanks.
Answer
Submitted: Wednesday 20-JUN-2018 08:11 AM
The files linked below represent the as-built drawings for the structures. MDT provides them for informational purposes only. They do not include drawings for modifications to the structures, such as joint replacements and guardrail revisions and may not completely represent current conditions. Thus, some of the information contained in these documents may be out of date or not applicable with regard to the advertised project. The contractor should not rely solely on the as-built drawings provided for bidding purposes nor does any data in these files supersede the data in the contract documents. AS-BUILT DRAWINGS
|
|
-3-
Submitted: Friday 06-JUL-2018 10:23 AM
Company: Oftedal Construction
Contact: Jeremiah Assman
Could we please get the Geopac design files?
Answer
Submitted: Tuesday 10-JUL-2018 10:20 AM
The design files for the requested project are posted on the MDT FTP site for your use at: DESIGN FILES
The requested files do not represent the staked project, but are only design files. The Department cannot guarantee the accuracy of the electronic data, particularly as it may be called up by your computer, nor does any data in these files supersede the data in the contract documents. In addition, the Department will not make any revisions to the electronic files pertaining to the staked project, change ordered work, or changes that are made during construction to fit field conditions.
|