Skip to main content

Contract Information


Project Name SF 159 SW MONT SFTY IMPRV
Advertise Date 06/14/2018 04:00 PM
Close Date 07/09/2018 10:00 AM
Let Date 07/12/2018 09:00 AM

Notifications

No notifications found for this contract

Addendums

No addendums found for this contract

Clarifications

-1-
Submitted: Tuesday    10-JUL-2018 02:44 PM
Place classes Deck and Overlay-SF concrete with a temperature between 50 and 80 °F (10 and 26 °C). Place all other classes of concrete with a temperature between 50 and 85 °F (10 and 29 °C).

Questions

-1-
Submitted: Friday    06-JUL-2018 03:36 PM  
Company: Alpine Sign, Inc  
Contact: John  
Delineation - Linear-White-W-Beam are no longer available in the specified length. The length available is 31". Please change via Addendum.
Answer
Submitted: Monday    09-JUL-2018 11:18 AM  
Special Provision #16. B.  - Linear Delineation System - Guardrail is hereby revised as follows:
 
B.  Materials. Provide a product that is white in color and produces retro-reflection and high visibility across a very wide range of entrance and observation angles. Provide panels that are 31 inches long by 1.5 inches high. Provide a product that meets one of the following:...