Contract Information
| Project Name | COUNTY RD 02200-W OF CROW AGENCY |
| Advertise Date | 07/12/2018 04:00 PM |
| Close Date | 08/06/2018 10:00 AM |
| Let Date | 08/09/2018 09:00 AM |
Notifications
No notifications found for this contract
Addendums
|
-1-
Submitted: Thursday 02-AUG-2018 12:58 PM
An Addendum has been posted for this project: ADDENDUM
To download the addendum bid files, click here: BID FILES
|
-2-
Submitted: Tuesday 07-AUG-2018 02:10 PM
A 2nd Addendum has been posted for this project: ADDENDUM NO. 2
To download the addendum bid files, click here: BID FILES
|
Clarifications
-1-
Submitted: Friday 13-JUL-2018 12:23 PM
Special Provision #2 - Contract Time - Flex Time Proceed Date is hereby replaced with the following:
REVISED CONTRACT TIME - FLEX TIME PROCEED DATE
|
-2-
Submitted: Tuesday 24-JUL-2018 08:40 AM
Place classes Deck and Overlay-SF concrete with a temperature between 50 and 80 °F (10 and 26 °C). Place all other classes of concrete with a temperature between 50 and 85 °F (10 and 29 °C).
|
|
-3-
Submitted: Wednesday 08-AUG-2018 09:43 AM
The following special provisinos are hereby included in this contract:
MONTANA MADE GOODS [107] (REVISED 10-11-12)
Use Montana made goods and wooden materials on this project if such goods and materials are comparable in price and quality to non-Montana made goods and materials.
STATE PREFERECE [107] (ADDED 1-1-03)
This project does not involve federal aid funds; therefore the following preferences apply:
A. Under the provisions of 18-2-403, MCA, give preference to the employment of bona fide Montana residents in the performance of the work on this project.
B. Under the provisions of 18-1-102(1)(a)(i), MCA, a resident bidder can be given a preference only against a non-resident bidder from a state or country that itself enforces a preference in favor of its resident bidders, equal to the amount of preference that state or country gives to its bidders.
MERIT AND QUALIFICATION HIRING [107] (ADDED 1-1-03)
Hiring must be on the basis of merit and qualification and there must be no discrimination on the basis of race, color, religion, creed, political ideas, sex, age, marital status, physical or mental handicap or national origin.
|
Questions
|
-1-
Submitted: Tuesday 24-JUL-2018 09:52 AM
Company: Alpine Sign, Inc
Contact: John
Does MDT plan to change Sign Sheeting to the new June 1, 2018 specifications as this plan shows Type IV on all signs. I believe a new Sign Schedule is required.
Answer
Submitted: Friday 27-JUL-2018 01:28 PM
Revised: Tuesday 31-JUL-2018 09:18 AM
An addendum will be issued to upgrade the sheeting types to the current policy. Sheets S1, S2, S3, S4, S5 and S6 can be found at the following link: REVISED SIGNING PLANS S1-S6
The revised plan sheet #2 can be found at the following link: REVISED PLAN SHEET 2
|
|
-2-
Submitted: Thursday 26-JUL-2018 07:05 AM
Company: Century Companies, Inc.
Contact: Estimating
On Sheet 9 there is a note under the Additional Grading Frame Summary that states "Excavation Quantities-Material Unsuitable for roadway embankments" Does that include all of the excavation quantity or just the excavation quantity in the additional surfacing frame?
Answer
Submitted: Friday 27-JUL-2018 08:47 AM
The note does not include all of the excavation quantity. The note applies only to the quantities listed in the ADD. EMB IN PLACE # column of the ADDITIONAL GRADING summary frame.
|
|
-3-
Submitted: Tuesday 31-JUL-2018 03:59 PM
Company: Riverside Contracting Inc.
Contact: Dennis Devous
Could you please post the Mandatory sign in sheet for this project.
Answer
Submitted: Wednesday 01-AUG-2018 08:54 AM
The Mandatory Pre-Bid Conference Official Record of Attendance can be found at the following link: MANDATORY PRE-BID ATTENDANCE SHEET
|
|
-4-
Submitted: Friday 03-AUG-2018 10:38 AM
Company: Riverside Contracting INc.
Contact: Estimating
The way this project will be constructed with it being located in town we feel this project needs to be a 70 day contract to get the work sequenced properly. There is such a short area to get all items completed in such a short time. We request this Contract time be changed to 70days.
Answer
Submitted: Tuesday 07-AUG-2018 09:03 AM
An addendum will be issued to increase contract time from 40 Working Days to 55 Working Days.
|
|
-5-
Submitted: Friday 03-AUG-2018 10:41 AM
Company: Riverside Contyracting Inc.
Contact: Estimating
Please check the Milling summary and the Bid Proposal. These two items don't agree.
Answer
Submitted: Monday 06-AUG-2018 11:17 AM
The Milling Summary, Schedule of Items in the Bid Proposal, and Project Bids™ bid file all show a quantity of 7,290.00 square yards of cold milling.
|
|
-6-
Submitted: Sunday 05-AUG-2018 10:02 AM
Company: MWHC
Contact: Chris Connors
The project includes Frangible Breakaways and Structural Steel Posts but does not included bid items. Please add those items. It also includes guardrail in the special provisions and plan page 2 but there are no bid items or summary boxes with quantities. Should there be guardrail on this project?
Answer
Submitted: Tuesday 07-AUG-2018 09:00 AM
An addendum will be issued to add the following bid items:
POSTS - STEEL STRUCTURAL SIGN 614.00 LB
FRANG SIGN POST BKWY-S4 X 7.7 (S100X11) 4.00 EACH
Plan sheet S1 is hereby replaced with the attached: REVISED SHEET S1
Plan Sheet 2 incorrectly referenced Guardrail in the Table of Contents. There are no guardrail bid items included in this contract. Special Provision No. 30, OPTIONAL ROUND WOOD GUARDRAIL POSTS is hereby deleted from the contract.
Update
Submitted: Tuesday 07-AUG-2018 11:25 AM
Plan Sheet 2 is hereby replaced. The reference to Guardrail and also Remove Trees have been removed from the Plans Table of Contents. REVISED SHEET 2
|