Project Name US 2-POPLAR
Advertise Date 10/18/2018 04:00 PM
Close Date 11/09/2018 03:00 PM
Let Date 11/15/2018 09:00 AM

Notifications

No notifications found for this contract

Addendums

-1-
Submitted: Thursday 08-NOV-2018 01:50 PM
An Addendum has been posted for this project:  ADDENDUM
To download the addendum bid files, click here:  BID FILES

Clarifications

-1-
Submitted: Wednesday 07-NOV-2018 01:42 PM
Dirt runs have been added to the project folder located in Advertised Bid Packages and can be found at the following link:  DIRT RUNS

-2-
Submitted: Thursday 08-NOV-2018 02:20 PM
XML files representing existing and proposed surfacing have been added to the Design Files link in Question #7.  The disclaimer applies to these files as well.
-3-
Submitted: Thursday 08-NOV-2018 03:14 PM
A remote camera system is being added to the contract to allow for video monitoring of the US 2 / Kirn Road roundabout.  The Remote Camera System bid item will be added by addendum.  A link to the Remote Camera System special provision can be found here:  REMOTE CAMERA SYSTEM

Questions

-1-
Submitted: Tuesday   23-OCT-2018 04:46 PM  
Company: Century Companies, Inc.  
Contact: Estimating  
Can you please post the PCCP Joint Data.
Answer
Submitted: Wednesday 24-OCT-2018 09:02 AM
The PCCP Joint information can be found at the following link:
  PCCP JOINT
This information is provided for informational purposes only.

-2-
Submitted: Thursday  25-OCT-2018 08:52 AM  
Company: Century Companies, Inc.  
Contact: Estimating  
Can MDT provide any information on companies or suppliers it may have researched in the design of the concrete sculptures for the landscaping?
Answer
Submitted: Monday 05-NOV-2018 03:45 PM
There are no suppliers for the concrete sculptures.  See answer to Question #4.

-3-
Submitted: Thursday  25-OCT-2018 01:02 PM  
Company: Century Companies, Inc.  
Contact: Estimating
Can MDT please clarify the color and stamp pattern for the 3" and 6" median caps. Is this a different color and/or pattern than the brick red and tooled pattern for the truck apron? Can the truck apron pattern be clarified? Is it to be stamped or patterned tooled joints? I have seen both specified in the documents.
Answer
Submitted: Tuesday 30-OCT-2018 08:46 AM
The stamp pattern for the truck apron must be a brick pattern. The median caps can be brick pattern or cobble as shown in the plans. The patterns are to be stamped. In accordance with the special provision, joints are to be hand-tooled. All colored concrete is to be "Brick Red".

-4-
Submitted: Friday    26-OCT-2018 03:56 PM  
Company: Century Companies, Inc.  
Contact: Estimating
Can MDT please provide the CADD drawing of the concrete sculptures with measurements and/or coordinates.
Answer
Submitted: Tuesday    30-OCT-2018 10:09 AM  
Sculptures are to be cast-in-place concrete or pre-cast.  Provide shop drawings of sculptures showing shapes, colors and dimensions.  Provide one full-size mock up illustrating full range of colors, forms, finishes, reinforcement and anchoring mechanisms for sculpture.  The mock-up may remain in place as part of permanent construction, if approved by the Project Manager.  Forms for CIP concrete can be bendable fiber-board, plastic mold, Styrofoam or other material capable of creating smooth and detailed shapes as shown in the drawings.  Cold joints are to be located between different colors of concrete.  All visible edges of concrete must have ¼" rad corners.  Concrete mix for the sculptures is to conform with MDT standards for Concrete Class General. 
The linked CADD files are for information only for the contractor's use in generating shop drawings.
  CADD FILES

-5-
Submitted: Thursday  01-NOV-2018 08:52 AM  
Company: Century Companies, Inc.  
Contact: Estimating
There is a note at the bottom of the sidewalk summaries that states "Includes 4" of crushed aggregate course."  Is this crushed aggregate course incidental to the sidewalk?
Answer
Submitted: Monday 05-NOV-2018 03:42 PM
Yes, the cost of the crushed aggregate course is included in the cost of the sidewalk.

-6-
Submitted: Friday    02-NOV-2018 11:56 AM
Company: Western Systems, Inc.
Contact: Holton Ferguson
What bid item # is used for the Advance Flashing Beacon on Sheet E19?  Do you have a specific spec for this unit?
Answer
Submitted: Monday 05-NOV-2018 03:49 PM
The pole is paid for as item number 617 673 200 SIG STANDARD TYPE 1-200.  The lights are paid for as 617 483 110 SIG TRAF 1 COL – 1 WAY 12, and the service is paid for as 617 333 000 SERV ASSEMBLY MODIFY.  The signs are listed in the sign specifications and are paid for as the appropriate sign items.

-7-
Submitted: Tuesday   06-NOV-2018 10:05 AM  
Company: Knife River - Yellowstone  
Contact: Grant Clingingsmith
Can MDT please post all CAD files for the project including the proposed and existing surface in .xml format?
Answer
Submitted: Wednesday 07-NOV-2018 01:23 PM
The design files for the requested project are posted on the MDT FTP site for your use at:
  DESIGN FILES
The requested files do not represent the staked project, but are only design files. The Department cannot guarantee the accuracy of the electronic data, particularly as it may be called up by your computer, nor does any data in these files supersede the data in the contract documents. In addition, the Department will not make any revisions to the electronic files pertaining to the staked project, change ordered work, or changes that are made during construction to fit field conditions.

-8-
Submitted: Wednesday 07-NOV-2018 09:17 AM 
Company: Knife River - Yellowstone 
Contact: Grant Clingingsmith 
The total for 18" Storm Pipe in the proposal shows 1485.2 LF, however the total on the Storm Drain Summary for 18" pipe shows 742.6 LF. Please advise.

Answer
Submitted: Thursday 08-NOV-2018 02:03 PM 
Yes, the 18" Storm Drain Pipe in the Schedule of Items should be 742.6 Linear Feet and will be revised by Addendum.

-9-
Submitted: Wednesday 07-NOV-2018 09:45 AM

Company: Knife River - Yellowstone
Contact: Grant Clingingsmith
Special Provision #38 - Cement Treated Pulverized Base, Part B Materials, states "meet crushed aggregate course requirements of subsection 701.02.9." Based on the summary table, CAC is not shown for the CTPB work. Please indicate if the existing roadway aggregate that will be mixed with the pulverized asphalt, will be required to meet subsection 701.02.9.

Answer
Submitted: Tuesday 13-NOV-2018 08:24 AM
No, use the existing pulverized material as is.

-10-
Submitted: Friday    09-NOV-2018 07:34 AM  
Company: MWHC  
Contact: Chris Connors
Please clarify the Measurement and Payment section of SP #31.  What is meant by "Traffic gravel and traffic control for the temporary detours/widening at the roundabouts will be paid separately for each phase."  Is traffic control paid by the established bid item 618 030 005, by the unit?  Or, are some elements of traffic control to be considered incidental and included elsewhere in the bid?
Answer
Submitted: Tuesday 13-NOV-2018 08:21 AM
Temporary detour traffic control will be paid for by the unit.