Submitted: Friday 11-JAN-2019 09:01 AM
The General Wage Decision found in Section II or III of the bid package proposal is hereby replaced with the attached version.  The U.S. Department of Labor issued the revised Wage Decision on January 4, 2019.  The effective date and revisions to the first paragraph are the only changes.  There were no changes to actual wage rates or zone pay distances/locations.  GENERAL WAGE DECISION

Addendums

-1-
Submitted: Tuesday    05-FEB-2019 02:32 PM 
An Addendum has been posted for this project: ADDENDUM
To download the addendum bid files, click here: BID FILES

Clarifications

No clarifications found for this contract

Questions

-1-
Submitted: Friday    25-JAN-2019 02:07 PM
Company: Forterra
Contact: Dixie Brown
On the Bid Proposal it states that the 30" pipe(Item number 603 012 925) needs to be RCP, when you get into the the plans on page 10 it has RCP, Steel, Aluminium, and Corrugated Polyethylene, can you please confirm which pipe we need to quote.
Answer
Submitted: Tuesday    29-JAN-2019 08:30 AM
RCP is the basic bid item, however, the plans allow different pipe material options: steel, aluminum or plastic. The contractor can bid either of the pipe materials options indicated in the summary frame.

-2-
Submitted: Monday    28-JAN-2019 10:54 AM
Company: Capital Concrete, Inc.
Contact: Paul Chatriand
Decorative Concrete Median Cap: "Use a colorconditioning admixture, single-component, pigmented, water reducing, concrete admixture, factory formulated and packaged in cubic yard increments" This seems proprietary to one manufacturer. Will the department allow a product supplied by other manufactures to integrally color the concrete?
Answer
Submitted: Friday    01-FEB-2019 02:20 PM
Rescind Special Provision 21. DECORATIVE CONCRETE MEDIAN CAP and replace with the Special Provision linked:
MEDIAN CAP

-3-
Submitted: Monday    28-JAN-2019 01:55 PM
Company: White Resources Group, Inc.
Contact: Estimating
Sheet 21 (Longitudinal Contraction Joint - At Apron): Is this detail for the circulating roadway joint?
Sheets 21 and 22 and the summary: ({21} PCCP Mountable Curb Joint detail, {22}Curb and Gutter Joint detail) both of these details show 10" PCCP and the summary and other details call for 9" PCCP: Are the references to 10" PCCP in error?
Answer
Submitted: Monday    04-FEB-2019 03:35 PM
Sheets 21 - 24 have been updated.  Please review the updated details for answers to the questions.
 
REVISED PLAN SHEETS 21-24

-4-
Submitted: Tuesday   29-JAN-2019 08:40 AM
Company: White Resources Group, Inc.
Contact: estimating
Sheets 25 and 27 (inside corners) show areas of colored PCCP: 1. What separates the PCCP from the colored PCCP? 2. Sheet 23 (PCCP Joint Layout): there are longitudinal contraction joints shown in the colored PCCP areas, is this to be a construction joint?

Answer
Submitted: Friday 01-FEB-2019 07:45 AM
1.  A construction joint separates the PCCP from the colored PCCP.
2.  The joints shown as longitudinal contraction joints in the colored PCCP areas on Sheet 23 and 24 are hereby changed to construction joints.  Install a construction joint between the PCCP and the Colored PCCP.  Please review Detailed Drawing 501-00 for longitudinal construction joint details.

-5-
Submitted: Tuesday   29-JAN-2019 09:12 AM
Company: White Resources Group, Inc.
Contact: estimating
Would you provide the csv file for the joint layout?
Answer
Submitted: Friday   01-FEB-2019 10:05 AM
A CSV file will be produced and uploaded through the Q&A forum prior to bidding.

Updated

Submitted: Monday   04-FEB-2019 10:11 AM
CSV FILES

-6-
Submitted: Tuesday   29-JAN-2019 03:46 PM  
Company: Helena Sand & Gravel, Inc.  
Contact: Ken Frost  
Should this project have a bid item for traffic gravel along with an estimated quantity?
Answer
Submitted:   Friday  01-FEB-2019 10:23 AM
300 cubic yards of Traffic Gravel will be added to the Contract.  An addendum will be issued.
 

-7-
Submitted: Wednesday 30-JAN-2019 03:15 PM
Company: White Resources Group, Inc.
Contact: estimating
Sheet 21: Roundabout PCCP Joint Details - These details differ from the Detailed Drawing 501-00. (#10 vs. 1.5" dowels) and the PCCP to asphalt transition. Do we follow the plans or the detailed drawing?

Answer
Submitted: Friday 01-FEB-2019 07:32 AM
The Details shown in the plans govern over the Detailed Drawings.

-8-
Submitted: Monday    04-FEB-2019 09:23 AM  
Company: Helena Sand & Gravel, Inc.  
Contact: Ken Frost  
Landscaping: Other than provide a minimum of 2-1,500-gallon concrete cisterns, are there any other specifications or detailed drawings to follow?
Answer
Submitted: Tuesday    05-FEB-2019 12:40 PM
Please review the Roundabout Landscaping detail sheets and the Roundabout Landscape Features Special Provision for specifications and requirements.