-1-
Submitted: Friday 08-MAR-2019 03:42 PM
Company: Wharton Asphalt LLC
Contact: Lena D Wharton
Is a distributor truck going to be allowed to drive on the paths? Are we going to be responsible if truck breaks up any of the path?
Answer
Submitted: Monday 11-MAR-2019 09:17 AM
Updated: Monday 11-MAR-2019 09:42 AM
Please reference the following specification subsections:
108.06 METHODS AND EQUIPMENT - "Do not use equipment that damages the roadway..."
107.08 LOAD RESTRICTIONS - "Repair damaged roadways and structures resulting from construction operation at Contractor expense."
Additionally, there is one pedestrian bridge within the project limits (Library Path station 315+87) that has a 10-ton weight limit.
|